Prefab ADU advertising quotes the unit price, which is the building leaving the factory. The number you need is delivered, installed and permitted on your parcel, and the difference is routinely thirty to sixty percent. This page breaks out every component between those two figures.
The total installed cost of a prefab ADU typically ranges from $150,000 to $300,000, which is significantly higher than the base unit price.
Base prices for small prefab units (200-400 sq ft) start between $40,000 and $120,000, but this excludes site work and delivery.
Site preparation and foundation work generally account for 10% to 20% of the total budget, often costing $15,000 to $35,000.
Utility connections (water, sewer, electrical) are a major variable expense, typically adding $15,000 to $40,000 to the project.
Crane rental and delivery logistics for placing the prefab unit usually cost between $5,000 and $15,000.
Figures below are researched market numbers for budgeting and comparison. They are not quotes. Final pricing depends on your site, your jurisdiction, finish selections, foundation and utility distance.
ADU rules are set locally and change often. These are the provisions that most commonly control the outcome. Verify against your own jurisdiction before you design anything.
Prefab ADU advertising quotes the unit price, which is the cost of the building leaving the factory. The number you actually need is delivered and installed and permitted, and the difference between those two figures is routinely thirty to sixty percent of the unit price. Neither number is dishonest; they answer different questions, and only one of them is the question you are asking.
The components between unit price and finished cost are freight, crane and set, foundation, utility trenching and connection, site work and grading, permits and impact fees, and the engineering and energy documentation your jurisdiction requires. Of these, utility distance and site access have the widest variance, and both are knowable in advance if someone walks the site.
When you compare suppliers, normalize every quote to delivered-and-installed on your parcel before comparing anything. A supplier quoting a low unit price and excluding set and foundation will look cheaper than one quoting turnkey, right up until the invoices arrive. Ask each one for the same scope, in writing, including what they are not doing.
| Unit price | The building, leaving the factory. The advertised number. |
| Freight | Distance-driven, predictable, quotable in advance. |
| Crane and set | Site-access-driven. The widest-variance access item. |
| Foundation | Slab, pier or crawl. Engineered to local soils and seismic or wind. |
| Utility trenching and connection | Distance-driven. Measure before accepting an estimate. |
| Site work and grading | Includes spoil removal and drainage. |
| Permits, plan check and impact fees | Jurisdiction-set. Sometimes waived under a size threshold. |
| Engineering and energy documentation | Required for permit in most jurisdictions. |
Most pages on this subject put the cost behind a contact form. The reasoning is understandable and the result is that you cannot budget, cannot compare, and cannot tell whether a bid is reasonable until you have already given up your phone number to three companies.
We publish the figures instead. They are researched market ranges rather than quotes, and site conditions will move them more than any other factor, but a range you can plan against beats a call-back you have to wait for. The constraints that decide feasibility — setbacks, height, utility distance, site access — are stated up front for the same reason. If your project is not viable, that is worth knowing on the first visit rather than the third phone call.
Factory production windows move with queue depth, material lead times and seasonal demand. We quote the current window rather than a fixed promise, because anyone promising a specific delivery date months out without seeing the factory schedule is guessing. Permitting is usually the longer pole: in ministerial states the review clock is defined by statute, while in discretionary jurisdictions it can run considerably longer.
The sequence that controls your schedule is site plan, permit submittal, plan check and corrections, permit issuance, factory slot, delivery and set, then utility connection and final inspection. Factory build time overlaps permitting only if you commit to the slot before permits are issued, which carries its own risk.