Governed by AB 68 / AB 881 / SB 9. Here is what that actually permits, and what a unit costs delivered.
California regulates accessory dwelling units under AB 68 / AB 881 / SB 9. Local agencies must ministerially approve a detached ADU up to 800 sq ft with 4 ft side and rear setbacks, and cannot impose owner-occupancy requirements on permits. SB 9 additionally allows lot splits and up to two units on most single-family parcels.
Highest ADU permit volume of any state; Los Angeles alone issues thousands of ADU permits per year and the backyard-unit market is mature enough that appraisers have comparable sales.
Fees: Impact fees are prohibited on units under 750 sq ft. Review timeline: 60-day ministerial approval clock once the application is complete.
Base rate adjusted for California labor, code and freight.
| Footprint | Structure at $416/sq ft | Freight from plant |
|---|---|---|
| 385 sq ft | $160,160 | $18,360 (2,700 mi) |
| 500 sq ft | $208,000 | $18,360 (2,700 mi) |
| 800 sq ft | $332,800 | $18,360 (2,700 mi) |
| 1195 sq ft | $497,120 | $18,360 (2,700 mi) |
Structure only. Add foundation, permitting, survey, trenching, set and utility connection from the site-cost table below.
| Line item | Typical cost | What drives it |
|---|---|---|
| Foundation | $38–52 per sq ft | Pier and beam at the low end, full stem wall or slab at the high end. Soil type and frost depth decide. |
| Site survey | $5,400 | Required before permit in nearly every jurisdiction. Locates setbacks, easements and utility runs. |
| Permitting | $8,900 | Plan review, permit issuance and inspection fees. Ministerial-approval states run lower. |
| Lot clearing | $4,200 | Vegetation removal and grading for the pad and the crane or truck path. |
| Utility trenching | $185 per linear foot past 50 ft | Water, sewer and electrical from the main house or the street. This is the line most quotes omit. |
| Crane set | $8,600 | Required when truck access cannot reach the pad, or for any second-story module. |
| Freight | $6.80 per loaded mile | From the fabrication facility to your address. Long hauls and permit loads add escort cost. |
| Utility connection | $3,800–11,400 | Meter, panel and tie-in. Varies most with distance and whether a service upgrade is triggered. |
A state statute tells you what a jurisdiction must allow. It does not tell you how long the review will take, whether the building department has reviewed a factory-built submittal before, or whether local contractors know how to prepare a pad to a module manufacturer's tolerance. Those three things determine the experience, and they vary enormously between municipalities inside the same state.
Los Angeles is generally the path of least resistance in California for a simple reason: volume creates competence. A building department that has processed dozens of accessory dwelling permits has a checklist, a plans examiner who knows the statute, and an inspector who has seen a module set before. A rural jurisdiction processing its first one will get there, but the first submittal frequently comes back with comments that reflect unfamiliarity rather than actual deficiencies.
The second thing that varies is utility capacity. Statutes generally do not compel a water or sewer district to provide service that does not exist, so in areas at the edge of municipal infrastructure the binding constraint is a capacity letter rather than a zoning approval. Ask that question before you spend money on drawings.
The third is the assessor. Adding a permitted dwelling unit changes the assessed value of the parcel, and in states with rate caps or reassessment triggers the tax consequence can be material. It is almost always still worth doing where rents support the build, but it should be in the model rather than a surprise in the following tax year.
Factory-built detached unit. The whole building arrives finished and is set in hours. Structure runs about $416 per square foot at the Signature finish tier in this state. Fabrication overlaps permitting, so the calendar compresses. The trade-offs are real: you need truck or crane access to the pad, and the design is constrained to what can travel legally on a road.
Site-built detached unit. Complete design freedom and no transport constraint, at the cost of a schedule that runs six to fourteen months in most markets and a budget exposed to weather, subcontractor availability and material price movement across that whole period. For an unusual lot or a highly specific architectural requirement it is sometimes the only option.
Garage or basement conversion. Appears cheapest and frequently is not. The existing slab has no vapor barrier and no perimeter insulation, the ceiling height may be below the habitable minimum, the header over the vehicle opening was never sized to carry a wall, and there is no independent utility service. Once those are corrected the cost commonly lands within ten percent of a new factory unit — except that you have spent it on a building with no warranty, no new-construction envelope, and one less parking space.
The honest summary: conversions make sense when the existing structure is already sound, tall enough and dry. Otherwise the factory unit wins on cost per usable square foot and wins decisively on schedule certainty.
Title 24 energy compliance
California's Title 24 standards are the strictest residential energy code in the country, and every accessory unit must demonstrate compliance through either the prescriptive path or performance modeling. Factory construction has a structural advantage here because envelope air-sealing is done on a jig under controlled humidity rather than in a windy side yard, and blower-door results on factory units routinely beat site-built equivalents. Units in Climate Zones 1 through 6 need less cooling capacity than most contractors specify; zones 13 through 15 in the Central Valley and desert need substantially more.
The order of operations matters because two clocks run at once. A factory-built project sequences roughly like this: site survey and soils information first, then the foundation and site plan submitted for permit, then fabrication released to the production queue while that permit is in review, then foundation construction, then delivery and set, then utility connection and final inspection.
The reason this compresses the schedule relative to site-built construction is that fabrication and permitting overlap. On a site-built project nothing is framed until the permit issues. On a factory project the module is being built while the plans examiner works, so the permit clock and the build clock consume the same calendar days rather than consecutive ones. 60-day ministerial approval clock once the application is complete.
Two documents cause most of the delay when they are missing: a current survey showing setbacks and easements, and evidence of utility capacity at the service point. Both can be obtained before the permit application, and both routinely are not.
Slot-based, not a fixed promise.
A factory runs a queue. When you reserve a slot you are buying a position in that queue, and the honest answer to "how fast" depends on three things: how many slots are already committed, the lead time on the specific materials your configuration calls for, and whether your permit clears before your slot opens.
Current windows run 30 to 90 days from released engineering to delivery for standard configurations. Smaller units with Essential finishes sit at the fast end. Anything with a ballistic package, a hurricane-rated envelope, custom glazing or a second story sits at the slow end because those components have their own supply lead times.
The reason this beats a site-built schedule is not that the factory works faster on any given day. It is that permitting and fabrication run in parallel instead of in sequence, and the on-site set is measured in hours rather than months. Weather stops a framing crew; it does not stop a production line.
Windows move with demand and material availability. A slot quoted today holds while capacity lasts.